Untitled Document
  • 5th December 2011 – Engine Bay

    Once we had got the body back on it was really late into the evening, but these are some pictures taken the next morning in proper daylight. We are delighted to finally have the body back on the chassis ready for further work over the winter months. We think the complete set of heat shields now fitted and polished up just look amazing! Thank you again to Dale and Phil and Slipstream design for the CAD work and production.





  • 3rd December 2011 – Body Bolt locations

    Since writing our post on 3rd December about getting the body back on, we have had a few people email us asking where the 20 bolts for securing the body to the chassis are located. So this is a little extra post with some pics showing the locations. 20 bolts in total. 2 each side at the rear of the boot, there is 1 each side of the rear wheel arch in the boot, 1 each side next to the sill in the cabin, 4 each side in the foot welld holding the dash frame and door hinges and finally 2 each side at the front. In the picture below, the front bolts are not in yet as we haven’t got around to drilling the holes through the heatshield panels. These 2 are alan key bolts going through to the front wheel arches.