We both arrange to get another day together to get on with the build. The last weekend we both had free was end of February where we had respraying the footwells. We were keen to get cracking again. The first job of the day was to refit all the bits we striped off in order to do the painting. This included putting back the pedal box, battery shelf and brake reservoir bracket and reconnect the throttle linkage.
Mark had spent a few more hours over previous weeks polishing up the rods and blades getting them extra shiny in preparation for the final fit. We decided as a little extra that we would make some extra plastic washers for the rose joints to try to prevent any potential rattles between the joint and the bracket.
Once altogether and everything fully tightened up, we then spent over an hour tinkering to getting the leverage of the pedal between idle and full throttle absolutely perfect. I’m glad to say we finally got there. Considering Mark designed our mechanism (based on photos of Andy Gordan’s Car) we are really happy and think it look great.
—
Leave A Comment