We decided at this point to get the throttle linkage mechanism finished and fully fitted. We did the first fit back on 28th January, but now we have all the necessary bits to finish off.
This involved connecting the springs to the throttle lever on the carb and Mark’s newly made bracket as well as make all the connections tight and fully lined up. We carefully worked out the leverage of the throttle going from idle to full to make sure there was always some tension in the springs at all times. We then marked up the position for the spring holes before drilling and connecting them up.

Next we added smaller springs either side of the connections on the transverse rod. This is to keep everything inline as well as to allow some movement when the engine is running. We secured these all in place with collars either side.

When we originally fitted the throttle linkage on the 28th Jan we made a temporary bracket to secure the transverse rod connection to the inlet manifold. The intension was to design and make a better solution and since then that is what we have done. We marked up 2 pieces of the stainless steel for the new bracket and asked our uncle Dave if he could wield it together for us along with a threaded boss on the top that the rose joint screws directly into.
To finish the 2 brackets off we rounded off the corners then shortened where necessary before polishing them both up.